With C14/C13 in an old CLV, one common flue under positive pressure goes into the old inner pipe, with a tee per boiler (semi-CLV). You choose between rigid stainless steel, PZ C14 Star in black PP or PR C14 Flexible.

Read more

Enter the number of appliances and the height above to get the parts list for your CLV.

How C14 and C13 work in an old CLV

The new column goes into the old inner pipe, which stays in place as a casing. Each boiler has a tee in that column. With C14 the air enters through the existing CLV mesh cap, as before, and flows down the jacket in counterflow with the flue gas. With C13 there is also one common flue, but each appliance takes its air separately. Both are approved as one unit with the boiler.

The concentric boiler connection ends open in the jacket. Only the flue pipe passes through the wall of the old inner pipe into the tee. Around that passage goes an ALU sealing collar per boiler, 80/125 or 60/100, so the jacket stays airtight towards the old inner pipe.

Only use boilers approved for a collective flue under positive pressure, C(10) or C(14), according to gas.be (NBN D 51-003 annex E). Each boiler has backflow protection, and the connection has a fall of at least 3° towards the boiler.

Three versions

Rigid stainless steelPZ C14 StarPR C14 Flexible
MaterialStainless steel 316, IE rangeRigid black PPFlexible PP
TeeWith ø80 branchWith screw-off connection pipe ø60 or ø80Connection set per boiler
At the bottom of the CLVBase plate with condensate drainSupport foot and condensate drainBase set and condensate element
ExpansionNo separate partAbsorber under each teeTaken up by the flexible liner
Choose this ifThe old inner pipe is straight and round and you want stainless steelThe old inner pipe is straight and roundThe old inner pipe is not straight or too narrow

How to build your list, from top to bottom

  1. Top: cap and cover on the old inner pipe (stainless steel), or terminal with spacers (PZ C14 Star). The existing CLV mesh cap stays the air inlet.
  2. Pipes up to the highest tee, and between the tees.
  3. One tee per boiler. With PZ C14 Star an absorber goes under each tee.
  4. Per boiler a connection set and an ALU sealing collar.
  5. Bottom: condensate drain and siphon for positive pressure.
  6. Base: base plate (stainless steel) or support foot (PZ C14 Star).
  7. For stainless steel: a clamping band on every joint.

For PR C14 Flexible the order is: mounting set at the top, liner, a connection set and sealing collar per boiler, base set and condensate element at the bottom. There must be at least 2.5 m of liner between two connections.

Frequently asked questions

Is C14 the same as a semi-CLV?

Yes. In a semi-CLV a new common flue pipe goes into the existing shaft and the shaft itself supplies the air. That is C14.

What is the difference between C14 and C13?

Both have one common flue. With C14 the air comes through the jacket of the CLV, with C13 each appliance has its own air supply.

What diameter does the column need?

It follows from a calculation to EN 13384-2, with the number of boilers, their output, the height and the size of the old inner pipe. Send us the data and we will check it.

Can the existing boilers stay?

Only if each boiler is approved for a collective flue under positive pressure. That is on the rating plate, or ask the manufacturer.

Filter by:
Stock
  • More Less
Delivery time
  • More Less
Diameter
  • More Less
Colour
  • More Less
Temperature resistant
  • More Less
Classification
  • More Less
Suitable for
  • More Less
Test pressure
  • More Less
Wall thickness
  • More Less
Gasket
  • More Less
Material
  • More Less
Net weight
  • to
Dimensions
  • More Less

C14/C13 CLV renovation: semi-CLV in an old CLV

CF5006.jpg
Tube 50 cm concentric CF series

4 variants

IE100-enkelwandige-buis-1-meter-inox
Tube 1 meter single wall stainless IE series

16 variants

trekkende-kap-enkelwandig-inox-rookgasafvoer-ld-flue
Pulling hood single wall stainless IE series

12 variants

klemband-enkelwandig-inox-rookgasafvoer-ld-flue
Clamp single wall stainless IE series

14 variants

condenslekdop-enkelwandig-inox-rookgasafvoer-ld-flue
Condensation leak cap single wall stainless IE series

15 variants

schachtafdekplaat-met-stormkraag-enkelwandig-inox-rookgasafvoer-ld-flue
Shaft cover plate with storm collar single wall stainless IE series

12 variants

t-stuk-90-graden-met-aftakking-80-enkelwandig-inox-rookgasafvoer-ld-flue
T-piece 90° with seal and branch ø80

13 variants

PLW3340100.jpg
Rectangular finishing plate (RAL 9003) with opening

3 variants

PRAMF08110.jpg
Connection set ø80/125 for multiple shunt and CLV

3 variants

PREM110.jpg
Condensation element with drain piece via shaft

3 variants

PRF110.jpg
Black flexible PP per meter

3 variants

PRF110R30.jpg
Black flexible PP per roll (30m)

3 variants

130ppbmf
Basic set for shunt and CLV

3 variants

PRMS110.jpg
Mounting kit 2 (snout end and suspension)

3 variants

buis-1-m-pps-zwart-uv-bestendig-met-mof-rookgasafvoer-ld-flue
Tube 1 meter black PP PZ series

8 variants

afstandhouder-starre-buis-schacht-pps-zwart-ld-flue
Spacer black PP PZ series

6 variants

Absorber 500 mm black PP (expansion joint), PZ C14 Star
Absorber 500 mm black PP (expansion joint), PZ C14 Star

5 variants

Ground support for socket with drain, PZ C14 Star
Ground support for socket with drain, PZ C14 Star

6 variants

C14 tee 87° with screw-on connection pipe (PZC14T)
C14 tee 87° 1 m with screw-on connection pipe, PZ C14 Star

8 variants

dakdoorvoer-uitmonding-pps-zwart-uv-bestendig-dakkap-ld-flue
Outlet (dormer)

7 variants